Question: please answer all 2. (25 points) A manager wants to assign tasks to workstations as efficiently as possible. a. (5 points) Draw the precedence diagram.
please answer all
2. (25 points) A manager wants to assign tasks to workstations as efficiently as possible. a. (5 points) Draw the precedence diagram. b. (5 points) Assuming a 7.5-hour workday, compute the cycle time needed to obtain an output of 225 units per day. c. (5 points) Determine the minimum number of workstations required. d. (5 points) Assign tasks according to greatest positional weight (sum of each task's time and the times of all following tasks) e. (5 points) Compute the resulting percent idle time for each worker (workstations). Task Immediate Predecessor Task Time (in minutes) a 0.2 b a 0.2 b 0.6 DOO d --- 0.3 d e f 0.5 0.1 f 0.7 10 C h g 0.5 i 0.3 c, e, h i 0.8 k k 0.8 HARR

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
