Question: Please answer all 3 if possible! (Please write out correct answer and whether it's A,B,C or D). A part is produced in batch sizes of


A part is produced in batch sizes of 30, requiring within-batch wait time of 290 minutes. The part is manufactured in two departments: cutting and assembly. The part requires 4 minutes in cutting and 6 minutes in assembly. It takes 8 minutes to move a batch from cutting to assembly. Compute the value-added lead time. O 298 minutes O 308 minutes O 10 minutes O 18 minutes A part is produced in batch sizes of 30, requiring within-batch wait time of 290 minutes. The part is manufactured in two departments: cutting and assembly. The part requires 4 minutes in cutting and 6 minutes in assembly. It takes 8 minutes to move a batch from cutting to assembly. Compute the non-value added lead time. O 290 minutes O 18 minutes O 308 minutes O 298 minutes The time interval between when a product enters production and when it is completed is the O lead time O setup time batch time O queue time
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts