Question: Please answer all parts. a - 5 | | 9 a e 12 8 12 20 5.10) Enter the following information into an Excel spreadsheet.

Please answer all parts.Please answer all parts. a - 5 | | 9 a e 12 8 12

a - 5 | | 9 a e 12 8 12 20 5.10) Enter the following information into an Excel spreadsheet. The time estimates were made at the 90 percent level (see Section 5.2, Calculating Probabilistic Activity Times subsection). All activity times are in days. Activity Predec. Opt. Normal Pess. 5 6 9 b 4 4 6 7 15 d 6 6 6 b 4 5 7 f b 16 17 g h 7 9 16 i 14 18 j f,g 6 20 k h 7 9 14 a) Draw the network. (You may use MSP or draw an AOA or AON network by hand.) b) Using Excel, calculate the expected time (TE) and variance for each activity. c) Using the expected times, find the path with the longest expected time. What is the expected time to complete this path? (Use the analytic method.) d) Find the probability that the critical path will be completed in 38 days or less. e) Are there any serious sources of merger problems? What are they? Calculate the probability of finishing the project on or before Day 38 when merger considerations are included. d, e 10 12

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!