Question: Please answer ASAP. Please show all work! Thank you!! A Product A has the product structure diagram and processing characteristics shown. The master production schedule

Please answer ASAP. Please show all work!
Thank you!!
A Product A has the product structure diagram and processing characteristics shown. The master production schedule calls for 200 units of the product to be produced in week 8. Determine weekly capacity requirements at each workstation (for items Band D, each operation occurs in a different week). B (2) Item Operation Hours/ unit 0.25 C (2) D A 0.2 B 1 1 2 3 1 1 2 Workstation 100 200 300 100 300 200 300 Lead Time (wks) 1 1 1 1 1 1 1 0.5 0.5 0.1 D 0.3 0.5 1 2 3 4 5 6 7 8 Week Workstation 100 200 300 A Product A has the product structure diagram and processing characteristics shown. The master production schedule calls for 200 units of the product to be produced in week 8. Determine weekly capacity requirements at each workstation (for items Band D, each operation occurs in a different week). B (2) Item Operation Hours/ unit 0.25 C (2) D A 0.2 B 1 1 2 3 1 1 2 Workstation 100 200 300 100 300 200 300 Lead Time (wks) 1 1 1 1 1 1 1 0.5 0.5 0.1 D 0.3 0.5 1 2 3 4 5 6 7 8 Week Workstation 100 200 300
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
