Question: ***PLEASE ANSWER B & C I ALREADY COMPLETED PART A*** this is all the information I am provided. Please answer at least part b. b)
***PLEASE ANSWER B & C I ALREADY COMPLETED PART A*** this is all the information I am provided. Please answer at least part b.

b) Determine the gross quantities needed of each item if you are to assemble brackets.
c) Compute the net quantities needed if there are of the base and of the clamp in stock.
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 1 clamp and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below wit the corresponding item. b) Determine the gross quantities needed of each item if you are to assemble 150 brackets. Click the icon to view the completed product structure. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number)Step by Step Solution
There are 3 Steps involved in it