Question: Please answer correctly A male worker runs a stamping press machine during an 8-hour shift. He only takes one half an hour lunch break: His
Please answer correctly
A male worker runs a stamping press machine during an 8-hour shift. He only takes one half an hour lunch break: His energy expenditure rate during work is 6.2kcal/min. a) What is the time-weighted average energy expenditure rate during the 8-hour shift? (7.5 pt) b) For 7.5hr of work, what should be the duration of his rest break to bring his energy expenditure rate to normal level? (7.5pt)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock