Question: please answer in the same order. Exercise 17-14 Activity-based costing A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on


Exercise 17-14 Activity-based costing A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data Direct materials Direct Overhead (Bee of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) ded Edge $ 9,600 6, 200 18,600 $ 34,400 10,7eeft, 3.21 Squared Edge Total $ 21,400 $ 31,000 12,600 18,200 36, 800 54, Gee $ 69, 408 $183,800 14, 2eeft, $ 4.89 Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,600 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information overhead Cost Category Activity Cost Pool Supervision Depreciation of machinery Assembly line preparation Total overhead Cost 5 2,184 29,160 23,256 $ 54,600 She has also collected the following information about the cost drivers for each category icost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) usage Overhead cont category CELTY Cost Pool SLO Dearest of machines Aaseline Preparation ORAVA Direct labor cost NachEn hout Setups Rounded Edge 9200 200 hours Squard Edge Size 800 hours 9 Total 518,280 hours Thes Required: TO LOVED She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rete and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Direct labor cost (5) Machine hours Setups (number) Rounded Edge $6,280 200 hours 30 times Squared Edge $12, eee Bee hours 93 times Total $18, 209 1,888 hours 123 tines Required: 1. Assign these three overhead cost pools to each of the two products using ABC Overhead Cost Activity Drivers Activity Rate Direct labor cost 96 Activity Supervision Depreciation of machinery Assembly fine preparation Machine hours Setups Rounded edge Activity rate Activity driver incurred Overhead assigned 96 Supervisor Depreciation of machinery Assembly line preparation Squared edge Activity rate Activity driver incurred Overhead assigned Component Super Deprecation of machinery Assaly pred Required: ALL nene Overhead Cost Activity Dis Activity Rate Direct labor cost % IA Supervion Depreciation of machinery Assembly line preparation Machine hours Setups Rounded edge Activity rate Activity driver incurred Overhead assigned 94 Supervision Depreciation of machinery Assembly line preparation Squared edge Activity rate Activity driver incurred Overhead assigned 196 Components Supervision Depreciation of machinery Assembly line preparation 2. Determine average cost per foot for each of the two products using ABC Rounded edge Squared edge Na
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
