Question: please answer part b A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operabion occurs separately trom, and simulaneously
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operabion occurs separately trom, and simulaneously with, the sawing and sanding which are. independent sequential operationt. A product needs to go through only one of the theee assombly operations (the cperaticns are in paratie). a) is the bottleneck b) The bottieneck time is minutes per unit (round your respanse to two decimal places)