Question: PLEASE ANSWER QUESTIONS 1-4 DETERMINE THE SUBSIDY RATE FOR ONE HOUR OF POOL TIME FOR EACH OF THE PROGRAMS. ASSUME A 10% CONTINGENCY COST ASSOCIATED
PLEASE ANSWER QUESTIONS 1-4
DETERMINE THE SUBSIDY RATE FOR ONE HOUR OF POOL TIME FOR EACH OF THE PROGRAMS.ASSUME A 10% CONTINGENCY COST ASSOCIATED WITH THE FACILITY.
P = price
F = fixed costs
V = variable costs
C = contingency costs
N = demand
S = subsidy rate
Unit cost = $149.77
S = negative number if program to make profit
S = 0 if breakeven
S = positive number if subsidized
P = ((F + V + C[F + V])/N) (1 S)
OR
P = Unit cost x (1 S) ** ok to use this one
| Programs | Subsidy | Service | Pool cost per hour |
| Open swim | 0% | Public | ??? 3.1 ??? |
| Party rental | 20% | Private | ??? 3.2 ??? |
| Elite swim team | 15% | Private | ??? 3.3 ??? |
| Lap swim | 10% | Merit | ??? 3.4 ??? |
- Determine the cost for one hour of pool time for the open swim program.
- Determine the cost for one hour of pool time for the party rental program.
- Determine the cost for one hour of pool time for the elite swim team program.
- Determine the cost for one hour of pool time for the lap swim program.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
