Question: Please answer the question and fill out the table. Thank you 2. Product X assembled by ABC manufacturing company has the following product structure tree.
Please answer the question and fill out the table. Thank you


2. Product X assembled by ABC manufacturing company has the following product structure tree. The master production schedule (MPS) calls for assembling 1000 units of X in week 6 and 900 units of X in week 8. Y(2) N S(2) R (T2) R(2) U Safety Stock Number Allocated Scheduled Receipts Quantity Week 150 100 The inventory status report for product X is: Item On- Lot Size Lead Code Hand Time (weeks) X 300 LFL 1 Y LFL 1 z 200 625+ 2 R 100 1200+ 1 S 200 400+ 2 T 400 300+ 2 U 150 200+ 1 500 100 1 3 50 75 100 100 50 150 25 75 100 2 WEEK rem LEVEL OT LEAD ON SAFETY ALU- COPE CODE SIZ MEMAND stock CATE - 3 4 5 GI 8 R. FR AV N.RU Ro Re P.O.RU Gile 52 |AY. NR PORC PORL GR SR AV NR. ROPA POHRL GRL sk. AV NR. PO.RS po RL GRE CROSS REQUIREMENTS SRS $ EDULED RECEPT AV LAVALABLG W.R. NE REQUIREMENTS POROPLANNED ORDER REIS PORE PLANNE ORDER RELEASE 2. Product X assembled by ABC manufacturing company has the following product structure tree. The master production schedule (MPS) calls for assembling 1000 units of X in week 6 and 900 units of X in week 8. Y(2) N S(2) R (T2) R(2) U Safety Stock Number Allocated Scheduled Receipts Quantity Week 150 100 The inventory status report for product X is: Item On- Lot Size Lead Code Hand Time (weeks) X 300 LFL 1 Y LFL 1 z 200 625+ 2 R 100 1200+ 1 S 200 400+ 2 T 400 300+ 2 U 150 200+ 1 500 100 1 3 50 75 100 100 50 150 25 75 100 2 WEEK rem LEVEL OT LEAD ON SAFETY ALU- COPE CODE SIZ MEMAND stock CATE - 3 4 5 GI 8 R. FR AV N.RU Ro Re P.O.RU Gile 52 |AY. NR PORC PORL GR SR AV NR. ROPA POHRL GRL sk. AV NR. PO.RS po RL GRE CROSS REQUIREMENTS SRS $ EDULED RECEPT AV LAVALABLG W.R. NE REQUIREMENTS POROPLANNED ORDER REIS PORE PLANNE ORDER RELEASE
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts