Question: please answer the two questions clearly for a thumbs up! 1. [30 pts] A firm produces three products (A, B, and C) on three machines

please answer the two questions clearly for a
please answer the two questions clearly for a thumbs up!
1. [30 pts] A firm produces three products (A, B, and C) on three machines (activities) labeled 1, 2 and 3. Assume Product B is twice as "difficult to move as A or C. Considering the process plan provided in the table below, calculate the equivalent flow volume on a from-to-chart. Product Process Plan Quantities/Shift A 1-2-3 10 B 2-1 3-1-2 15 5 2. [30 pts) Nikk, Inc, a manufacture of plastic garden tools, is analyzing the purchase of a new type of injection molding equipment that can produce the end product itself. In other words, no addtional operations or equipments are needed. The company wants to produce 2000 non- defective units/day. Assuming 3% scrap, 2% rework, 85% efficiency, 97% equipment reliability factor and each unit can be manufactures in 72 sec. Determine how many pieces of the new injection molding equipment must be purchased, if it operates on two 8 hrs shifts per day. 200 non defundsdage 1. [30 pts] A firm produces three products (A, B, and C) on three machines (activities) labeled 1, 2 and 3. Assume Product B is twice as "difficult to move as A or C. Considering the process plan provided in the table below, calculate the equivalent flow volume on a from-to-chart. Product Process Plan Quantities/Shift A 1-2-3 10 B 2-1 3-1-2 15 5 2. [30 pts) Nikk, Inc, a manufacture of plastic garden tools, is analyzing the purchase of a new type of injection molding equipment that can produce the end product itself. In other words, no addtional operations or equipments are needed. The company wants to produce 2000 non- defective units/day. Assuming 3% scrap, 2% rework, 85% efficiency, 97% equipment reliability factor and each unit can be manufactures in 72 sec. Determine how many pieces of the new injection molding equipment must be purchased, if it operates on two 8 hrs shifts per day. 200 non defundsdage

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!