Question: please answer this Receiving Inspection Space Reg (m ) (6) (2) (5) 90 Figure 1 shows the From-to matrix (in times) To Assembly Painting Machining

please answer this please answer this Receiving Inspection Space Reg
Receiving Inspection Space Reg (m ) (6) (2) (5) 90 Figure 1 shows the From-to matrix (in times) To Assembly Painting Machining From ((1) (3) Assembly ((1) 150 250 Painting (2) 80 Machining (3) Receiving (4) Shipping (5) Inspection (6) 0 60 40 30 0 80 40 240 40 60 90 0 a. Define the relationship between two department and draw the space relationship diagram. (20) b. Draw the ARD using Dimensionless Block Diagram. (20) c. Using point (a) and (b) generate a layout. (30) d. Based on your layout, calculate the total material handling. (Traveling cost - $ 2/trip/meter) (30) Receiving Inspection Space Reg (m ) (6) (2) (5) 90 Figure 1 shows the From-to matrix (in times) To Assembly Painting Machining From ((1) (3) Assembly ((1) 150 250 Painting (2) 80 Machining (3) Receiving (4) Shipping (5) Inspection (6) 0 60 40 30 0 80 40 240 40 60 90 0 a. Define the relationship between two department and draw the space relationship diagram. (20) b. Draw the ARD using Dimensionless Block Diagram. (20) c. Using point (a) and (b) generate a layout. (30) d. Based on your layout, calculate the total material handling. (Traveling cost - $ 2/trip/meter) (30)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!