Question: **PLEASE ANSWER USING A SPREADSHEET AND PROVIDE A LINK TO THE SPREADSHEET FOR FURTHER STUDY** Problem 2 (points) At a single-phase, multiple-channel service facility, customers

**PLEASE ANSWER USING A SPREADSHEET AND PROVIDE A LINK TO THE SPREADSHEET FOR FURTHER STUDY**

**PLEASE ANSWER USING A SPREADSHEET AND PROVIDE A LINK TO THE SPREADSHEET

Problem 2 (points) At a single-phase, multiple-channel service facility, customers arrive randomly. Statistical analysis of past data shows that the interarrival time has a mean of 10 minutes and is exponentially distributed. The service time per customer has a mean of4 minutes and is exponentially distributed. The arrival buffer capacity is 4 customers. The lost customer cost due to blocking is $100 per customer. The waiting cost is $50 per customer per hour. The server cost is $15 per server per hour. The Performancexls spreadsheet was used to enerate the calculations in the table below. Arrival Service #of Buffer Ave. Prob. Prob. Ave. Overall Ave. Ave. Rate Time Servers Cap. Util. blocking waiting (if queue Ave. flow lnv. not length wait time blocked} . , c K 0 Ptbloci-c) P(wait) t. T. 1 0.1 4 1 4 39.75% 0.617009% 39.37% 0.2440 2.46 6.46 0.642 2 0.1 4 2 4 20.00% 0.00853% 6.66% 0.0165 0.17 4.17 0.417 3 0.1 4 3 4 13.33% 0.00023% 0.82% 0.0013 0.01 4.01 0.401 a. Find the optimal number of servers to be employed (only 1, 2, or 3 servers is possible) to minimize the total of lost customer cost, waiting cost, and server cost. b. Find the average overall waiting time and the average total flow time through the system for the optimal case. 0. If a fourth server were possible what do you think would happen to total cost in a four server system

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!