Question: Please answer with good presentation, using commas and dollar sign in each figure Job order costing; rework Canyon City Co. uses a job order costing

Please answer with good presentation, using commas and dollar sign in each figure

Please answer with good presentation, using commas and dollar sign in each

Job order costing; rework Canyon City Co. uses a job order costing system that combines actual direct material and actual direct labor costs with a predetermined overhead charge based on machine hours. Expected overhead and machine hours of $852,600 and 87,000, respectively, were used in developing the predetermined rate for the year. During the year, the company worked on Job #876 and incurred the following costs and machine hours: Direct material $28,500 Direct labor $13,080 Machine hours 195 a 1. What is the total cost of Job #876? $ 2. What is the cost per unit if 900 were made? Note: Round your answer to two decimal places. $ b. In completing Job #876, 18 units were defective and had to be reworked at a cost of $25 each. Assume that spoilage and rework costs were included in the original estimated overhead costs. Where does the $450 rework cost appear in the accounts of Canyon City Co.? c. Disregard the facts in (b). Upon completing Job #876, the quality control inspector determined that 18 units were spoiled and would be unacceptable to the customer. Eighteen additional good units were made at a total cost of $834. The spoiled units were sold for $144 as "seconds" to an outlet store. What is the total cost of Job #876? $

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!