Question: please assist with this MRP schedule problem. 3.2 A wheelbarrow is made up of: one wheel (A); one bucket (B); two legs (C), and two

please assist with this MRP schedule problem.please assist with this MRP schedule problem. 3.2 A wheelbarrow is made

3.2 A wheelbarrow is made up of: one wheel (A); one bucket (B); two legs (C), and two handles (D). The wheel (A) is made up of one axle (E), three spacers (F) and one axle bracket (G). The master production schedule, lot sizes, lead times, on-hand inventory and scheduled receipts are given below: 3.2.1 Construct a product structure tree for the wheelbarrow. Identify all levels, parents, and components. (3) [TURN OVER] 6 EPT1601 3.2.2 Prepare a Material Requirements Plan (MRP) for the wheelbarrow to cover a 6-week planning period (Use the table on the next page to answer the question). (11)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!