Question: PLEASE BE QUICK! A textile company has a production plan for three different products (suits, jeans and coats) will prepare. The production system consists of
PLEASE BE QUICK!
A textile company has a production plan for three different products (suits, jeans and coats) will prepare. The production system consists of four processes: cutting, numbering, sewing and ironing. consists of. During the planning period, 2000, 5000 and 1000 pieces are requested to be produced. The data required for production are given in the tables below. Workshop Unit production time (hour) Suit Jeans Coat Production capacity (hour) Cut 1/50 1/100 1/80 180 Numbering 1/80 1/200 1/120 185 Planting 1 / 0.3 1/2 1 / 0.5 192 Ironing 1/20 1/50 1/30 160 Product Per Unit net selling price Per unit variable cost Sales Potential Least Sales Potential Most Suit 4500 3250 2200 2800 Jeans 950 610 5000 5500 Overcoat 4000 2800 700 1250 For a suit and a coat, 2.80m and 2.50m of fabric are required, respectively. Suit and 3500m of fabric can be used for the coat. For jeans, as much fabric as needed can be provided. The sewing of any product is done to the subcontractor in order to be able to deliver on time. can be made. If contract manufacturing is preferred, production costs increase by 250 pb. Cut department can work overtime not exceeding 50 hours during the semester. Overtime unit increases the costs by 3% for suits, 2% for jeans and 1.5% for coats. Which It will allow us to calculate how much of the product we produce will minimize the total cost. Set up the linear programming model.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
