Question: please can anyone help with the solution to this question? Crosslist ELE X ELEC2607la Microsoft W eFlorida Powr - Two Differen Communica X Com 2018.pdf

please can anyone help with the solution to this question?
Crosslist ELE X ELEC2607la Microsoft W eFlorida Powr - Two Differen Communica X Com 2018.pdf nter 2017t 2-Winter KssManga Read m Library Genesis?watch Free Marvel s lli svsc 3501 Drpt cxTete oksl Mas ells Ea ati Question (8) Saskatchewan Environmental Consulting (SEC) Inc. designs plans and specifications for asbestos abatement (removal) projects in public, private and governmental buildings. Currently, SEC must conduct an air test before allowing the re-occupancy of a building from which asbestos has been removed. SEC subcontracts air-test samples to a laboratory for analysis by transmission electron microscopy (TEM). To offset the cost of TEM analysis, SEC charges its clients $100 more than the subcontractor's fee. The only expenses in this system are the costs of shipping and air-test samples to the subcontractor and the labour involved in shipping the samples, with the growth of the business, SEC is having to consider either continuing to subcontract the TEM analysis to outside companies or developing its own TEM laboratory. With recent government regulation requiring the removal of asbestos, SEC expects about 1000 air-sample testing per year over eight years. The firm's MARR is known to be 12% Subcontract option. The client is charged $400 per sample. Which is $100 above the subcontracting fee of S300. Labour expenses are $1500 per year. And shipping expenses are estimated to be 0.50 per sample I purchase option. The purchase and installation cost for the TEM is $415,000. The TEM equipment would last for eight years, at which time it should have no salvage value. The design and renovation cost is estimated to be $9500. the client is c Based on the current market price. One full time manager and two part-time technicians are needed to operate the laboratory Their combined annual salaries will be $50,000. Material required to operate the lab includes carbon rods, copper grids, filter equipment, and acetone. The costs of these materials are estimated at $6000 per year. Utility costs, operating and maintenance costs, and the indirect labour needed to maintain the la extra income- tax expense would be $20,000. harged $300 per sample. b are estimated at $18,000 per year. The (a) Determine the cost of an air-sample test by the TEM (in-house) (b) What is the required number of air samples per year to make the two options equivalent
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
