Question: Please can you answer all the steps mainly step 6 You work for Thunderduck Custom Tabias inc. This is the first month of operations. The






You work for Thunderduck Custom Tabias inc. This is the first month of operations. The company designs and raanufactures specially tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and buld the tables. The company does not have indirect materials You will be keeping track of the costs incurred to manufacture the tables using Job in 1 Cost Sheet and Job 12 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows Assume a $65 per hour wage rate to the assembly employees The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours The company estimates that there will be 120 direct labor hours worked during the month The fixed estimated manulacturing overheed costs per nonth are: The first order you received was to manufacture a table using a table top and four legs. This is your Job \#1. The customer that has ordered Job \#2, wants a table that is the same as Job \#1, but wants to also add a drawer to the table: The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journar" tab of the excel file using the proper format. Please use the following accounts: 1-Dec Raw materials purchased on account, $21,000 1-Dec Rarw materials purchased on account, $21,000 5-Dec All Raw materials needed for Job 11 were requested from the material storage for use during the month. Nll materials are direct (After you journalize this entry please enter the information into Job \#1 Cost Sheet) 10-Dec The following employee costs were incurted but not paid during the month: Direct labor for Job \#1, consisted of 60 hours at a rate of $65 per hour, totaling $3,900. (Atter you journalize this entry please enter the information inte Job #1 Cost Sheet) Salary for supervisor of the factory $2,800 Administrative Salary $2,000. 12-Dec Manufacturing overhead cost was applied based on direct labor hours to Job H1 using the POHR calculated in Question 1 (After you journalize this entry phease enter the information inth Job #1 Cost Sheet) 15-Dec Al Raw materlals needed for Job m2 wore requestod from the material storage for use during the month All inaterials are direct. (After you journalize this entry please enter the information into Job W2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $600. 16-Dec Rent for the month of December for the factory building incurred but not paid $600. 17-Dec Advertising costs incurred but not paid for the month was $1,600 20-Dec Depreciation for the month of December was recorded on equipment $950 ( $700 for equipment used in the factory and $250 for equipment used in setling and administrative activities) 24. Dec Property insurance incurred but not paid $1,850 ( $1,300 for the factory and $550 for selling and administrative offices) 26-Dec Job \#1 was completed and transferred to Finishod Goods during the month 28- Dec The completed table was sold on account to the customer for $26,000 during the month. (Hint. Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec By the end of the month, 30 hours of direct labor were incurred at a rate of $65 per hour, totaling $1,950 to begin production on job \#2. The employees will be paid next month. (Atter you journalize this entry please enter the information into Job $2 Cost Sheet) Post the journal entries that you recorded on the "General Journal" tab to the 'T-accounts (General Ledger)' tab and calculate the balance for each account. This is the company's first month of business, so there will not be any beginning balances 31-Dec Record the entry in the general journal to close the Manufacturing Overhead account and adfust for overapplied/underapplied overhead Prepare a Schedule of Cost of Goods Manqfactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS" tab for Job \#1 and Job 12 that wereworked on during the month by the company. Make sure fo follow the format noted in your book (pg 109). (Hint. This is the company's first month of operations and therefore the beginning balances will be zero.) Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab: Use the following check figures and make any necessary corrections Step 6 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Answer the following additonal questions. Be sure to write all numbers as positive and no answer should be left blank What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the ending balance for accounts payable? From the Schedule of Cost of Goods Manufactured, what are the raw materials used in production? What is the actual manufacturing overhead cost incurred during December? What is the total applied manufacturing ove head cost during December? What is the unadjusted cost of goods sold? Was the manufacturing overhead for month December overapplied/underapplied ? Enter either underapplied or overapplied What is the dollar amount of overapplied/underapplied manufacturing overhead? What is the adjusted cost of goods sold? What is the gross margin (in dollars) from the income statement? What is the total prime cost from the Job \#1 Cost Sheet? What is the total conversion cost from the Job A1 Cost Sheet? 10790 8910 0 25050 5400 4950 12100 underapplied 450 12550 9050 8800 8200 9 What is the unadjusted cost of goods sold? 10 11 12 13 14 15 16 17 18 19 20 Was the manufacturing overhead for month December overapplied/underapplied ? Enter either underapplied or overapplied What is the dollar amount of overapplied/underapplied manufacturing overhead? What is the adjusted cost of goods sold? What is the gross margin (in dollars) from the income statement? What is the total prime cost from the Job \#1 Cost Sheet? What is the total conversion cost from the Job \#1 Cost Sheet? What is the total product cost from the Job 31 Cost Sheet? What was the period cost incurred for the month of December? What is the contribution margin (in dollars) for Job \#1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.) If job\# 1 was for five tables instead of one, what would be the total amount of variable cost recorded on Job \#1's cost sheet?? If the factory has the capacity to produce five tables each month, what would be the total actual fixed manufacturing overhead cost (in dollars) incurred if five tables were produced instead of one? 12100 underapplied 450 12550 9050 8800 8200 121000 4400 4400 3650 You work for Thunderduck Custom Tabias inc. This is the first month of operations. The company designs and raanufactures specially tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and buld the tables. The company does not have indirect materials You will be keeping track of the costs incurred to manufacture the tables using Job in 1 Cost Sheet and Job 12 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows Assume a $65 per hour wage rate to the assembly employees The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours The company estimates that there will be 120 direct labor hours worked during the month The fixed estimated manulacturing overheed costs per nonth are: The first order you received was to manufacture a table using a table top and four legs. This is your Job \#1. The customer that has ordered Job \#2, wants a table that is the same as Job \#1, but wants to also add a drawer to the table: The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journar" tab of the excel file using the proper format. Please use the following accounts: 1-Dec Raw materials purchased on account, $21,000 1-Dec Rarw materials purchased on account, $21,000 5-Dec All Raw materials needed for Job 11 were requested from the material storage for use during the month. Nll materials are direct (After you journalize this entry please enter the information into Job \#1 Cost Sheet) 10-Dec The following employee costs were incurted but not paid during the month: Direct labor for Job \#1, consisted of 60 hours at a rate of $65 per hour, totaling $3,900. (Atter you journalize this entry please enter the information inte Job #1 Cost Sheet) Salary for supervisor of the factory $2,800 Administrative Salary $2,000. 12-Dec Manufacturing overhead cost was applied based on direct labor hours to Job H1 using the POHR calculated in Question 1 (After you journalize this entry phease enter the information inth Job #1 Cost Sheet) 15-Dec Al Raw materlals needed for Job m2 wore requestod from the material storage for use during the month All inaterials are direct. (After you journalize this entry please enter the information into Job W2 Cost Sheet) 16-Dec Rent for the month of December for the factory building incurred but not paid $600. 16-Dec Rent for the month of December for the factory building incurred but not paid $600. 17-Dec Advertising costs incurred but not paid for the month was $1,600 20-Dec Depreciation for the month of December was recorded on equipment $950 ( $700 for equipment used in the factory and $250 for equipment used in setling and administrative activities) 24. Dec Property insurance incurred but not paid $1,850 ( $1,300 for the factory and $550 for selling and administrative offices) 26-Dec Job \#1 was completed and transferred to Finishod Goods during the month 28- Dec The completed table was sold on account to the customer for $26,000 during the month. (Hint. Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec By the end of the month, 30 hours of direct labor were incurred at a rate of $65 per hour, totaling $1,950 to begin production on job \#2. The employees will be paid next month. (Atter you journalize this entry please enter the information into Job $2 Cost Sheet) Post the journal entries that you recorded on the "General Journal" tab to the 'T-accounts (General Ledger)' tab and calculate the balance for each account. This is the company's first month of business, so there will not be any beginning balances 31-Dec Record the entry in the general journal to close the Manufacturing Overhead account and adfust for overapplied/underapplied overhead Prepare a Schedule of Cost of Goods Manqfactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS" tab for Job \#1 and Job 12 that wereworked on during the month by the company. Make sure fo follow the format noted in your book (pg 109). (Hint. This is the company's first month of operations and therefore the beginning balances will be zero.) Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab: Use the following check figures and make any necessary corrections Step 6 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Answer the following additonal questions. Be sure to write all numbers as positive and no answer should be left blank What is the ending balance for raw materials? What is the ending balance for work in process? What is the ending balance for finished goods? What is the ending balance for accounts payable? From the Schedule of Cost of Goods Manufactured, what are the raw materials used in production? What is the actual manufacturing overhead cost incurred during December? What is the total applied manufacturing ove head cost during December? What is the unadjusted cost of goods sold? Was the manufacturing overhead for month December overapplied/underapplied ? Enter either underapplied or overapplied What is the dollar amount of overapplied/underapplied manufacturing overhead? What is the adjusted cost of goods sold? What is the gross margin (in dollars) from the income statement? What is the total prime cost from the Job \#1 Cost Sheet? What is the total conversion cost from the Job A1 Cost Sheet? 10790 8910 0 25050 5400 4950 12100 underapplied 450 12550 9050 8800 8200 9 What is the unadjusted cost of goods sold? 10 11 12 13 14 15 16 17 18 19 20 Was the manufacturing overhead for month December overapplied/underapplied ? Enter either underapplied or overapplied What is the dollar amount of overapplied/underapplied manufacturing overhead? What is the adjusted cost of goods sold? What is the gross margin (in dollars) from the income statement? What is the total prime cost from the Job \#1 Cost Sheet? What is the total conversion cost from the Job \#1 Cost Sheet? What is the total product cost from the Job 31 Cost Sheet? What was the period cost incurred for the month of December? What is the contribution margin (in dollars) for Job \#1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.) If job\# 1 was for five tables instead of one, what would be the total amount of variable cost recorded on Job \#1's cost sheet?? If the factory has the capacity to produce five tables each month, what would be the total actual fixed manufacturing overhead cost (in dollars) incurred if five tables were produced instead of one? 12100 underapplied 450 12550 9050 8800 8200 121000 4400 4400 3650
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
