Question: Please choose the correct answer from the options attached to each paragraph now select the correct answer Please choose the correct answer from the options
Please choose the correct answer from the options attached to each paragraph


now select the correct answer






Please choose the correct answer from the options attached to each paragraph
A company working in water management field is in the process of analyzing the risks associated to a water filters in residential buildings. It is using the evaluations and the matrix below in the process. For every part below, choose the correct option. Likelihood Severity \begin{tabular}{|c|c|c|c|} \hline 4 Tolerable & 8 Significant Insignificant & 12 Unacceptable Tolerable & 16 Unacceptable \\ \hline 3 Insignificant & 9 Tolerable & 12 Tolerable & Snacceptable Significant \\ \hline 1 Insignificant & Insignificant Insignificant & Tolerable 4 \\ \hline \end{tabular} c- [5 points] The company evaluated the risk of a water filter corrosion that is highly likelv and could cause insionificant damaqe. This risk is before beginning to use the water filter in buildings after installation of the water filter after an actual use of a water filter for house needs setting up the dangers associated with an usage of a water filter understanding what can be done to remove the opportunity of exposure to a risk analyzing how likely every potential risk is to happen c- [5 points] The company evaluated the risk of a water filter corrosion that is highly likely and could cause insignificant damage. This risk is d- [5 points] The company evaluated the risk of the failure of the filter element as insignificant. Since this risk to be e- [5 points] After the risks have been evaluated, d- [5 points] The company evaluated the risk of the failure of the filter element as insignificant. Since this risk to be highly unlikely and could lead to a slight harm highly unlikely and could lead to possible fatality quite likely and could lead to serious injuries develop the action plan for their control create a list of the workers affected by them provide a recording documentation that reflects the implementation results of the risk assessment f - [5 points] When controlling the risks, the failure of the filter element will have a higher priority than the water filter corrosion ^ the water filter corrosion will have a higher priority than the failure of the filter element the failure of the filter element will have a higher priority than the water filter corrosion the water filter corrosion and the failure of the filter element will have the same priority
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts