Question: Please complete on MS Project and show steps. Project Beta B The network schedule of a site development project is planned as below. Develop a

Please complete on MS Project and show steps.Please complete on MS Project and show steps.

Please complete on MS Project and show steps.

Project Beta B The network schedule of a site development project is planned as below. Develop a preliminary schedule of the project using Microsoft Project. The project starts on June 1, 2021. The project runs eight hours a day and five days a week, Monday through Friday. Activity Box Build Activity ID playground 10 ES DU EF Set flagpole LS TF LF Rough grade 2 3 Lay out work 4 Security fence 7 Move in Demon shed 5 Pave parking lot 6 Finish grade 5 Clear site 7 Bring in fill 6 Fig. B1 Site layout: Lot 1 Lot 2 Lot 3 Playground (PG) Fig. B2 Activity breakdown: Lay out work Lay out work - Lot 1 Lay out work - Lot 2 Lay out work - Lot 3 Lay out work -PG Fig. B3 After a review of the preliminary schedule, the owner asked to develop a schedule that finishes the project as early as possible. The scheduler reviewed the project drawings and noticed that the site consisted of three lots and a playground. The size of lots are Lot 1 (0.4 acre), Lot 2 (0.3 acre), and Lot 3 (0.3 acre). See Fig. B2. Then, the scheduler asked the project engineers of individual activities to submit the detailed production rate per lot. The revised estimates are given in Table B1. Using the updated schedule information, propose a crashed (the shortest) project schedule to meet the owner's expectation. Assume one crew for each activity. This means that one activity cannot be carried out at two or more lots concurrently. See Fig. B3. Tasks #6, #7, #8, and #9 can be carried out, if necessary, SIX days a week, Monday through Saturday, with some additional costs. Playground 1 day Table B1. Activity breakdown and duration estimates. Activities Lot 1 Lot 2 Lot 3 1 Move in 2 Lay out work 1 day 1 day 1 day 3 Clear site 3 days 2 days 2 days 4 Rough grade 1 day 1 day 0.5 day 5 Demo shed 2 days 1 days 1 day 6 Bring in fill 2 days 2 days 2 days 7 Build playground 8 Security fence 2 days 2 days 2 days 9 Finish grade 2 days 2 days 1 days 10 Set flagpole 11 Pave parking lot 3 days 3 days 0.5 day 1 day Duration 1 day 4 days 7 days days 5 days 6 days 10 days 7 days 5 days 2 days 6 days 10 days 1 day 2 days Q Answer Question B.1 in the Exam Report. END Project Beta B The network schedule of a site development project is planned as below. Develop a preliminary schedule of the project using Microsoft Project. The project starts on June 1, 2021. The project runs eight hours a day and five days a week, Monday through Friday. Activity Box Build Activity ID playground 10 ES DU EF Set flagpole LS TF LF Rough grade 2 3 Lay out work 4 Security fence 7 Move in Demon shed 5 Pave parking lot 6 Finish grade 5 Clear site 7 Bring in fill 6 Fig. B1 Site layout: Lot 1 Lot 2 Lot 3 Playground (PG) Fig. B2 Activity breakdown: Lay out work Lay out work - Lot 1 Lay out work - Lot 2 Lay out work - Lot 3 Lay out work -PG Fig. B3 After a review of the preliminary schedule, the owner asked to develop a schedule that finishes the project as early as possible. The scheduler reviewed the project drawings and noticed that the site consisted of three lots and a playground. The size of lots are Lot 1 (0.4 acre), Lot 2 (0.3 acre), and Lot 3 (0.3 acre). See Fig. B2. Then, the scheduler asked the project engineers of individual activities to submit the detailed production rate per lot. The revised estimates are given in Table B1. Using the updated schedule information, propose a crashed (the shortest) project schedule to meet the owner's expectation. Assume one crew for each activity. This means that one activity cannot be carried out at two or more lots concurrently. See Fig. B3. Tasks #6, #7, #8, and #9 can be carried out, if necessary, SIX days a week, Monday through Saturday, with some additional costs. Playground 1 day Table B1. Activity breakdown and duration estimates. Activities Lot 1 Lot 2 Lot 3 1 Move in 2 Lay out work 1 day 1 day 1 day 3 Clear site 3 days 2 days 2 days 4 Rough grade 1 day 1 day 0.5 day 5 Demo shed 2 days 1 days 1 day 6 Bring in fill 2 days 2 days 2 days 7 Build playground 8 Security fence 2 days 2 days 2 days 9 Finish grade 2 days 2 days 1 days 10 Set flagpole 11 Pave parking lot 3 days 3 days 0.5 day 1 day Duration 1 day 4 days 7 days days 5 days 6 days 10 days 7 days 5 days 2 days 6 days 10 days 1 day 2 days Q Answer Question B.1 in the Exam Report. END

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!