Question: Please create a Construction Plan. Project Plan for 2 0 2 0 ' platform frame house with gable roof. Materials: Please list all materials. Excavation

Please create a Construction Plan.
Project Plan for 2020' platform frame house with gable roof.
Materials: Please list all materials.
Excavation
Excavator or backhoe
Foundation Materials
J Bolts, termite shields, Concrete, waterproofing, drain tile, insulation
Platform Frame Materials
Sill Plates, Wood joists, plywood sheathing (subfloor)
Walls, sole plate, double top plate
Roofing Materials
Rafters, collar tie, fascia, eaves, ridge beam, plywood sheathing, felt paper, shingles
Where do you get the materials?
Manpower? How many people do you need?
Three months for two men at 8 hours per day
16 hours 5=80 hours/week 12=960
Materials, equipment, labor
Safety procedures
Who is your insurance?
How will you pay? You must create a schedule of values base on the cost of $50,000.
Overhead expense which is 5% of your total cost.
Profit will be 5% of the total cost.
Material delivery schedule
Please watch the video:
Please create a Construction Plan. Project Plan

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!