Question: Please do not use AI , answer with worked answers, practice q ' s;A hydropower plant with 9 0 0 M W rated power has
Please do not use AI answer with worked answers, practice qs;A hydropower plant with rated power has both upper and lower reservoirs. The water drains from the upper reservoir to
the lower one, for storage, and in that process generates power through the turbinegenerator system.
The upper reservoir has a surface area of and has maximum water level of and minimum water level of
The lower reservoir is at
Calculate neglecting all losses and head variation during water flow:
The volume of water displaced from the upper reservoir to the lower reservoir assuming vertical reservoir walls is Blank
The mass of displaced water density is Blank
Average head of the upper reservoir with respect to the lower reservoir Blank
Potential energy of the water use Blank
Duration for which the plant can run autonomously at its rated power Blank hrs
Please enter your answers in a numerical format rounded to two decimal places.
Blank
Blank Add your answer
Blank
Blank Add your answer
Blank Add your answer
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock