1- Consider the precedence relationship between activities of an assembly illustrated in figure below. The cycle time (T) of the assembly line is 9 minutes. The time for each activity is illustrated in the figure below. a) Show the activities that are assigned to each work station. b) Calculate the efficiency and smoothness indices. O 2 5 5 3 7 4 6 3 7 8 4