Please explain every step throughly, thank you.
Consider the following project network, where the number over each node is the time required for that activity. Consider the problem of finding the longest path (the largest total time) through this network from the finish, since the longest path is the critical path. Use dynamic programming to solve this problem (show the stages for the dynamic programming formulation)