Question: Please figure it out by using the From to chart. figure out the efficiency, total points and the penalty points. **** DO NOT COPY FROM

Please figure it out by using the From to chart. figure out the efficiency, total points and the penalty points.

**** DO NOT COPY FROM OTHER CHEGG QUESTIONS OR ELSE I WILL DISLIKE****** **** DO NOT COPY FROM OTHER CHEGG QUESTIONS OR ELSE I WILL DISLIKE******

**** DO NOT COPY FROM OTHER CHEGG QUESTIONS OR ELSE I WILL DISLIKE******

Please figure it out by using the From to chart.Please figure it out by using the From to chart.

1. You have (5) products, each of which goes through (5) manufacturing operations, and each weighs a different amount. The plant layout is sequenced as shown for Product #1 (A-B-C-D-E). Here are the processes and weights: Product Manufacturing Sequence Weight E #1 B D 2 lbs #2 B A D E 7 lbs. #3 B A E D 5 lbs. #4 A A D B E 3 lbs. E E #5 B D 9 lbs. Complete From/To Chart #1 on the next page, including total points and penalty points. Analyze your results and redesign the layout, then complete From/To Chart #2 with the new layout. Forward movement multiplier is 1x per square, backward movement multiplier is 2x per square. 25 pts for each chart, 2 pts for each of the six answers below. Layout #1: Total points Penalty points Efficiency Layout #2: Total points Penalty points Efficiency Chart #1 Initial State To (destination machine or work center) Penalty Total Pts Points From (origin machine or work center Chart #2 - Improved State To (destination machine or work center) Penalty Total Pts Points From (origin machine or work center 1. You have (5) products, each of which goes through (5) manufacturing operations, and each weighs a different amount. The plant layout is sequenced as shown for Product #1 (A-B-C-D-E). Here are the processes and weights: Product Manufacturing Sequence Weight E #1 B D 2 lbs #2 B A D E 7 lbs. #3 B A E D 5 lbs. #4 A A D B E 3 lbs. E E #5 B D 9 lbs. Complete From/To Chart #1 on the next page, including total points and penalty points. Analyze your results and redesign the layout, then complete From/To Chart #2 with the new layout. Forward movement multiplier is 1x per square, backward movement multiplier is 2x per square. 25 pts for each chart, 2 pts for each of the six answers below. Layout #1: Total points Penalty points Efficiency Layout #2: Total points Penalty points Efficiency Chart #1 Initial State To (destination machine or work center) Penalty Total Pts Points From (origin machine or work center Chart #2 - Improved State To (destination machine or work center) Penalty Total Pts Points From (origin machine or work center

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!