Question: please help! and if there is a solution equation please add the equation. 4. A manager wants to build 3-sigma x-bar control limits for a

please help! and if there is a solution equationplease help! and if there is a solution equation please add the equation.
4. A manager wants to build 3-sigma x-bar control limits for a process. The target value for the mean of the process is 10 units, and the standard deviation of the process is 6. If samples of size 9 are to be taken, what will be the upper and lower control limits, respectively? A) -8 and 28 B) 16 and 4 C) 12 and 8 D) 4 and 16 E) 8 and 12 I 5. A manager wishes to build a 3-sigma range chart for a process. The sample size is five, the mean of sample means is 16.01, and the average range is 5.3. From Table S6.1, the appropriate value of D3 is 0, and D4 is 2.115. What are the UCL and LCL, respectively, for this range chart? A) 33.9 and 11.2 B) 33.9 and 0 C) 11.2 and 0 D) 6.3 and o E) 31.91 and 0.11

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!