Question: please help asap A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with

please help asap
please help asap A production process at Kenneth
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). a 5 units/hr 2.5 units/hr Sanding Assembly 0.8 units/hr a Sawing 13 Welding 5 units/hr Assembly 0.8 units/hr Drilling 2.1 units/hr Assembly 0.8 units/hr a) Drilling is the bottleneck b) The bottleneck time is minutes per unit (round your response to two decimal places) c) The throughput time of the overall system is minutes (round your response to two decimal places). d) If the firm operates 9 hours per day, 20 days per month, the monthly capacity of the manufacturing process is units (enter your response as a whole number)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!