Question: please help me answering the question 1)which is your advice to Mr wonka? 2) how do you redesign the existing layout? please i want a
please help me answering the question
CASE STUDY ON FACILITY LAYOUT DESIGN II In Willy Wonka's factory, main task is to assemble sub elements manually. There are eleven work stations. The dimensions are 20 x 12.5 m. Willy Wonka needs help on redesigning the existing layout because of some reasons such as extra space requirement (70 m2) and adding new products/customers, free spaces should be kept, space of existing assembly activities tried to be decreased etc. Workstations 1, 2, 3 can not be moved. Material flow is shown with unit load (UL). Supply is applied by using KANBAN. KANBAN has three stopping points (unload and load) and at the end, final good is manufactured. What is your advice to Mr. Wonka? How do you redesign the existing layout? 0,5 m STOP STOP 6 UL 1 6 10 UL 10 UL STOP 0,5 m 4 UL 12 UL 3 UL 10 UL 20 UL 2 UL 22 U1 11 22 UL 22 UL
1)which is your advice to Mr wonka?
2) how do you redesign the existing layout?
please i want a correct answers also would be perfect if you solve it on PC
asap thanks
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock