Question: Please help me find the standard fixed overhead costs. It is NOT 650,000. Thank you Dr WIP inventory ?? Cr. Factory overhead ?? Johnny Lee

Please help me find the standard fixed overhead costs. It is NOT 650,000. Thank you

Dr WIP inventory ??

Cr. Factory overhead ??

Johnny Lee Incorporated produces a line of small gasoline-powered engines that can be used in a variety of residential machines, ranging from different types of lawnmowers, to snowblowers, to garden tools (such as tillers and weed-whackers). The basic product line consists of three different models, each meant to fill the needs of a different market. Assume you are the cost accountant for this company and that you have been asked by the owner of the company to construct a flexible budget for factory overhead costs, which seem to be growing faster than revenues. Currently, the company uses machine hours (MHs) as the basis for assigning both variable and fixed factory overhead costs to products.

Within the relevant range of output, you determine that the following factory overhead costs per month should occur: engineering support, $16,000; insurance on the manufacturing facility, $6,000; property taxes on the manufacturing facility, $13,000; depreciation on manufacturing equipment, $14,800; and indirect labor costs of supervisory salaries, $15,800, setup labor, $3,400, and materials handling, $3,500. Variable factory overhead costs are budgeted at $16.00 per machine hour, as follows: electricity, $6.00; indirect materials for Material A of $1.00 and for Material B of $3.00; indirect labormaintenance, $5.00; and production-related supplies, $1.00.

Assume that in a given month (December) the standard allowed machine hours for output produced was 6,500. Also, assume that the denominator activity level for setting the predetermined overhead application rate is 7,250 machine hours per month.

Actual fixed overhead costs for the month of December were as follows: engineering support, $18,500 (salaries); factory insurance, $8,500; property taxes, $13,000; equipment depreciation, $14,800; supervisory salaries, $15,800; setup labor, $5,200; materials-handling labor, $5,400. The actual variable overhead cost per machine hour worked in December was equal to the standard cost except for the following two items: electricity, $6.50 per machine hour; and manufacturing supplies, $1.10 per machine hour. All salary and wage amounts have not yet been paid. The company used 6,600 machine hours in December.

The company uses a single overhead account, Factory Overhead, and performs a two-way analysis of the total factory overhead cost variance each month.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!

Q:

\f