Question: Please help me with step by step .Please send with PDF so that I can see everything Ch 17 - ABC Costing Problem (30 points)
Please help me with step by step .Please send with PDF so that I can see everything

Ch 17 - ABC Costing Problem (30 points) A company manufactures two products, Drills and Saws. Their total estimated overhead cost for the year is $1,044,000 and expected labor hours are 72,600 hours; 32,600 for drills and 40,000 for saws. The company is considering using ABC for applying overhead to their products, instead of a single traditional overhead rate. They have broken down their overhead costs into the following cost pools and cost drivers. Cost Pools Estimated Cost Driver Expected Use of Usage by Usage by Overhead Drivers Drills Saws Machine $741,600 Number of 10,000 setups 5,600 4,400 Setup Setups Inspection $302,400 Number of 12,600 inspections 6,800 5,800 Inspections Answer the following questions based on the data above: 1. Compute the single traditional overhead rate. (4 pts) 2. How much overhead is applied to Drills using the single overhead rate? (3 pts) . How much overhead is applied to Saws using the single overhead rate? (3 pts) . Compute the overhead rates for the Machine Setup cost pool using ABC. (5 pts) . Compute the overhead rates for the Inspection cost pool using ABC. (5 pts) . How much overheads is applied to Drills using ABC rates? (5 pts) . How much overhead is applied to Saws using ABC rates? (5 pts) Instructions: Show all calculations for each item, by numbering your answers. You can Show your work handwritten on paper or on Excel
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
