Question: please help me with the right option 8 Which types of overhead allocation methods result in the use of more than one overhead rate during

please help me with the right option 8

please help me with the right option 8 Which
Which types of overhead allocation methods result in the use of more than one overhead rate during the same time period? Select one: O a. Departmental overhead rate method. O b. Cost pool overhead rate method and plantwide overhead rate method. O c. Activity-based costing and plantwide overhead rate method. O d. Departmental overhead rate method and cost pool overhead rate method. O e. Plantwide overhead rate method and departmental overhead rate method