Question: Please help solve and show your work. 45. - 8 Points - Emerald Systems plans to manufacture its new line of smart watches at a

Please help solve and show your work. Please help solve and show your work. 45. - 8

45. - 8 Points - Emerald Systems plans to manufacture its new line of smart watches at a plant in Galway, Ireland. It has determined that it must produce 320 watches per 8-hour day to meet the forecasted demand for the product. Use line balancing and the information below to create a simple product layout for the manufacturing plant. Answer the questions below and show your work just as we did in class and in the line balancing examples. Note: The precedence diagram is shown in a separate pdf file also. Note: The precedence diagram is shown in a separate pdf file also. Task Immediate Predecessor --- Number of Followers A B A B Task Time (seconds) 15 13 18 17 21 13 17 14 22 16 D E F G H I J K Total E F D 1 J 8 Instructions: Determine the Number of Followers for each task and the total of the task times in the table above. Then answer the questions on the next page. Problem 45: Precedence Diagram B D H E F G I J K Problem 45 (continued) Calculate the required Cycle Time per unit. If you calculate a fractional value, round up to an integer value. Cycle Time = Operating Time per Day/Desired Output Rate Note: Operating Time must be converted to the same time units as task times. Cycle Time = Calculate the Theoretical Minimum Number of Workstations. Theoretical Minimum Number of WS = Sum of Task Times/Cycle Time Note: To avoid being short processing capacity, the number of workstations must always be rounded up. Theoretical Minimum = Using the previously calculated Cycle Time, assign tasks to work stations using the Greatest Number of Followers Rule Note: In the case of a tie, the task with the longest task time should be assigned first to a workstation Revised Time Work Time Eligible Tasks Eligible Tasks Task to Remaining Task Remaining Station Based on Precedence) (Fit in Remaining Time) Assign Time at Station af Station Idle Time Station

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!