Question: please help to solve question 1 Tutorial 3 Assembly Line Balanced Chart 1. Figure Q1 shows the tasks and the time involved in the process

please help to solve question 1please help to solve question 1 Tutorial 3

Tutorial 3 Assembly Line Balanced Chart 1. Figure Q1 shows the tasks and the time involved in the process flow of a roof-tile clay manufacturing Answer the Assembly Line Balancing questions using the information on the precedence diagram information provided. |||| . 5 10 11 3 7 A B F G Figure Q1(b): Assembly Line Balanced Chart 4 3 D Propose TWO (2) possible line balancing improvements in the clay roof-tile manufacturing. Show your results in efficiency measure. 12 11 E H Recalculate the new efficiency of the improved manufacturing system. 2 Answer the questions based on the CNC process data in Table Q2. Figure Q1: Precedence diagram of a Roof-Tile Clay Manufacturing (a) Determine: Table Q2: Parts Interarrival and Process Time Interarrival Part Number Process Time Time (minutes) (minutes) 1 4 i. The ideal number of workstations required for the clay roof-tile manufacturing system 2 5 3 ii. 3 2 4 The efficiency of the clay roof-tile manufacturing system with the current manufacturing workstations arrangement 4 8 6 5 3 2 6 7 7 (b) Analyse the Assembly Line Balancing (ALB) graph in Figure Q1(b). 1 2 Tutorial 3 Assembly Line Balanced Chart 1. Figure Q1 shows the tasks and the time involved in the process flow of a roof-tile clay manufacturing Answer the Assembly Line Balancing questions using the information on the precedence diagram information provided. |||| . 5 10 11 3 7 A B F G Figure Q1(b): Assembly Line Balanced Chart 4 3 D Propose TWO (2) possible line balancing improvements in the clay roof-tile manufacturing. Show your results in efficiency measure. 12 11 E H Recalculate the new efficiency of the improved manufacturing system. 2 Answer the questions based on the CNC process data in Table Q2. Figure Q1: Precedence diagram of a Roof-Tile Clay Manufacturing (a) Determine: Table Q2: Parts Interarrival and Process Time Interarrival Part Number Process Time Time (minutes) (minutes) 1 4 i. The ideal number of workstations required for the clay roof-tile manufacturing system 2 5 3 ii. 3 2 4 The efficiency of the clay roof-tile manufacturing system with the current manufacturing workstations arrangement 4 8 6 5 3 2 6 7 7 (b) Analyse the Assembly Line Balancing (ALB) graph in Figure Q1(b). 1 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!