Question: please help with 2 and is 1 correct? 2 Return to 25 points Mansfield Technology uses a job-order costing system. Its direct materials consist of
please help with 2
2 Return to 25 points Mansfield Technology uses a job-order costing system. Its direct materials consist of hardware and software that it purchases and installs on behalf of its clients. The firm's direct labor includes salaries of consultants that work at the client's job site, and its overhead consists of costs such as depreciation, utilities, and insurance related to the office headquarters as well as the office supplies that are consumed serving clients. The predetermined plantwide overhead rate for Mansfield Technology of $22.70 per direct labor-hour was computed based on the formula of estimated total manufacturing overhead cost of $272.400 divided by an estimated total activity level of 12,000 direct labor hours Mansfield Technology incurred actual total manufacturing overhead cost of $267.000 and 11,500 total direct labor hours during the period Required: Determine the amount of manufacturing overhead cost that would have been applied to all jobs during the period Answer is complete but not entirely correct. Manufacturing overhead applied $ 265,590 HW Chapter 2 1 1 25 Ray Corporation sector hours to wider estimated level of production Relly Corporation med 26.000 hours were manufacturing overhead cost is 5521000 for the current and C300 Hout Relly Corporation actuacturing overhead contoured 26.500 m Required: Compute the cow's twide predetermed verdwye Pound your awr 2018) Bufrecer
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
