Question: please help with the following: include the Microsoft Project File along with a memo thank you and answer part 3 questions: Red Zuma Project Part
please help with the following: include the Microsoft Project File along with a memo thank you and answer part 3 questions:
Red Zuma Project Part 3 Come of the Red Zone intor Wichis locaten Anped the back of the book you will start with your Mer Project from Part 2 Part You will need to turn con ong windoronto personal you what you were that you sono Yomo Wibowmen with a windows Word out the conceder 5 Youth work und Part Part 3 Top management has accepted the schedule created at the end of Part 2. Prepare a brief memo that addresses the following questions: 1. How much will the project cost? What is the most expensive activity? 2. What does the cash flow statement tell you about how costs are distributed over the life span of the project? Include a monthly cash flow for the project Once you are confident that you have the final chedule, save the file as a baseline. Hint: Save a backup file just in case without baseline BLE A2.5 Red Zuma: Project Schedule ID Duration Predecessors 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Task Name 1 Red Zuma Project 1.1 Market Analysis 1.2 Product Design 1.3 Manufacturing Study 1.4 Product Design Selection 1.5 Detailed Marketing Plan 1.6 Manufacturing Process 1.7 Detailed Product Design 1.8 Build Prototypes 1.9 Lab Test Prototypes 1.10 Field Test Prototypes 1.11 Finalized Product Design 1.12 Final Manufacturing Process 1.13 Order Components 1.14 Order Production Equipment 1.15 Install Production Equipment 1.16 Celebrate 260 days 25 days 30 days 20 days 10 days 15 days 30 days 45 days 25 days 10 days 15 days 20 days 10 days 7 days 14 days 35 days 1 days 2 2 3,4 5 5 5 8 9 9 7.10.11 12 12 13 14FS-20 days, 15FS+30 days 6.16 Nos refer to Finish to Startlas TABLE A2.6 Red Zuma Project Resources Number avallable Marketing specialist Design engineer Development engineer Industrial engineer Purchasing agent Test rider $ $80,000/yr $125,000/yr $110,000/yr $100,000/yr $75,000/yr $70/hr 4 4 4 4 2 4. Note: MS Project considers resources in terms of percentages with one full-time worker being 100% BLE A2.7 Red Zuma Resource Assignments Resource Names Task Name Red Zuma Project Market Analysis Product Design Manufacturing Study Product Design Selection Detailed Marketing Plan Manufacturing Process Detailed Product Design Build Prototypes Lab Test Prototypes Field Tests Marketing Specialist (400%] Marketing Specialist, Design Engineer [400%), Development Engineer (200%), Industrial Engineer, Purchasing Agent Industrial Engineer [400%). Development Engineer [200%) Marketing Specialist (200%), Design Engineer [300%], Development Engineer (200%), Industrial Engineer [200%], Purchasing Agent (25%) Marketing Specialist (400%] Design Engineer, Development Engineer [200%). Industrial Engineer [300%) Marketing Specialist (200%], Design Engineer [400%), Development Engineer [200%). Industrial Engineer [200%], Purchasing Agent (25%) Design Engineer [200%), Development Engineer (200%), Industrial Engineer (400%) Design Engineer (200%), Development Engineer (200%), Test Rider Marketing Specialist, Design Engineer (200%). Development Engineer, Industrial Engineer, Test Rider (300% Marketing Specialist (200%), Design Engineer (300%], Development Engineer (300%). Industrial Engineer [200%), Purchasing Agent (25%) Industrial Engineer (300%). Design Engineer, Purchasing Agent (25%) Purchasing Agent Purchasing Agent Design Engineer, Development Engineer (300%), Industrial Engineer [400%] Design Engineer [400%), Development Engineer (400%), Industrial Engineer (400%], Marketing Specialist (400%), Purchasing Agent [200%] Finalized Product Design Final Manufacturing Process Order Components Order Production Equipment Install Production Equipment Celebration Red Zuma Project Part 3 Come of the Red Zone intor Wichis locaten Anped the back of the book you will start with your Mer Project from Part 2 Part You will need to turn con ong windoronto personal you what you were that you sono Yomo Wibowmen with a windows Word out the conceder 5 Youth work und Part Part 3 Top management has accepted the schedule created at the end of Part 2. Prepare a brief memo that addresses the following questions: 1. How much will the project cost? What is the most expensive activity? 2. What does the cash flow statement tell you about how costs are distributed over the life span of the project? Include a monthly cash flow for the project Once you are confident that you have the final chedule, save the file as a baseline. Hint: Save a backup file just in case without baseline BLE A2.5 Red Zuma: Project Schedule ID Duration Predecessors 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Task Name 1 Red Zuma Project 1.1 Market Analysis 1.2 Product Design 1.3 Manufacturing Study 1.4 Product Design Selection 1.5 Detailed Marketing Plan 1.6 Manufacturing Process 1.7 Detailed Product Design 1.8 Build Prototypes 1.9 Lab Test Prototypes 1.10 Field Test Prototypes 1.11 Finalized Product Design 1.12 Final Manufacturing Process 1.13 Order Components 1.14 Order Production Equipment 1.15 Install Production Equipment 1.16 Celebrate 260 days 25 days 30 days 20 days 10 days 15 days 30 days 45 days 25 days 10 days 15 days 20 days 10 days 7 days 14 days 35 days 1 days 2 2 3,4 5 5 5 8 9 9 7.10.11 12 12 13 14FS-20 days, 15FS+30 days 6.16 Nos refer to Finish to Startlas TABLE A2.6 Red Zuma Project Resources Number avallable Marketing specialist Design engineer Development engineer Industrial engineer Purchasing agent Test rider $ $80,000/yr $125,000/yr $110,000/yr $100,000/yr $75,000/yr $70/hr 4 4 4 4 2 4. Note: MS Project considers resources in terms of percentages with one full-time worker being 100% BLE A2.7 Red Zuma Resource Assignments Resource Names Task Name Red Zuma Project Market Analysis Product Design Manufacturing Study Product Design Selection Detailed Marketing Plan Manufacturing Process Detailed Product Design Build Prototypes Lab Test Prototypes Field Tests Marketing Specialist (400%] Marketing Specialist, Design Engineer [400%), Development Engineer (200%), Industrial Engineer, Purchasing Agent Industrial Engineer [400%). Development Engineer [200%) Marketing Specialist (200%), Design Engineer [300%], Development Engineer (200%), Industrial Engineer [200%], Purchasing Agent (25%) Marketing Specialist (400%] Design Engineer, Development Engineer [200%). Industrial Engineer [300%) Marketing Specialist (200%], Design Engineer [400%), Development Engineer [200%). Industrial Engineer [200%], Purchasing Agent (25%) Design Engineer [200%), Development Engineer (200%), Industrial Engineer (400%) Design Engineer (200%), Development Engineer (200%), Test Rider Marketing Specialist, Design Engineer (200%). Development Engineer, Industrial Engineer, Test Rider (300% Marketing Specialist (200%), Design Engineer (300%], Development Engineer (300%). Industrial Engineer [200%), Purchasing Agent (25%) Industrial Engineer (300%). Design Engineer, Purchasing Agent (25%) Purchasing Agent Purchasing Agent Design Engineer, Development Engineer (300%), Industrial Engineer [400%] Design Engineer [400%), Development Engineer (400%), Industrial Engineer (400%], Marketing Specialist (400%), Purchasing Agent [200%] Finalized Product Design Final Manufacturing Process Order Components Order Production Equipment Install Production Equipment Celebration




Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
