Question: please help with the last part this is all info given in the problem. Rioy Creasey Enterprises, a machine shop, is planning to move to
Rioy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The now bulding will be 60 foot iong by 40 foet wide. Creasey envisions the bulding as having sx diatinct production areas, roughly equal in size. Ho feels strongty about safety and intends to have markad pathways throughout the buiding to faciltate the movemant of people and materials See the following bulding schematic. His foreman has completed a month-long study of the number of loads of material that have moved from one process to another in the current bulding. This information is contained in the fow matr on the let below. Finally, Creasey also devoloped a matrix to indicate distances between the work areas shown in the bulding schematic, shown on the right below: Based on the fows shown in the matrec is is likely that the processes Drills and are in rooms next to each othor as they have the highest number of moves between each other. Based on the fows shown in the matrix, it is likely that the processes Materials and are in rooms next to each other as they have the secend highest number of moves between each other. One of the layouts that could be designed is: Rioy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The now bulding will be 60 foot iong by 40 foet wide. Creasey envisions the bulding as having sx diatinct production areas, roughly equal in size. Ho feels strongty about safety and intends to have markad pathways throughout the buiding to faciltate the movemant of people and materials See the following bulding schematic. His foreman has completed a month-long study of the number of loads of material that have moved from one process to another in the current bulding. This information is contained in the fow matr on the let below. Finally, Creasey also devoloped a matrix to indicate distances between the work areas shown in the bulding schematic, shown on the right below: Based on the fows shown in the matrec is is likely that the processes Drills and are in rooms next to each othor as they have the highest number of moves between each other. Based on the fows shown in the matrix, it is likely that the processes Materials and are in rooms next to each other as they have the secend highest number of moves between each other. One of the layouts that could be designed is
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts