Question: Please help with these two calc problems. 1. Set up the requested integrals to find the work required to move a 200 lb, 25 ft

Please help with these two calc problems.

1. Set up the requested integrals to find the work required to move a 200 lb, 25 ft chain from fully extended, dangling from a 35 ft roof, to being almost entirely spooled atop the roof, less the bottom 4 feet dangling off the roof.

2. Set up the requested integrals to find the work required to move a 200 lb, 25 ft chain from being suspended from a 15 ft ceiling (so part of the chain is on the ground to start), then folded in half twice. i.e. we take the bottom of the chain, attach it to the top part (such that it's folded in half), and then we take the bottom of the folder chain, and secure it to the top again.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!