Question: Please help with this two part question given the information at the top. (20 points) Assume that a cogeneration heating distribution system can be constructed

Please help with this two part question given the information at the top.

Please help with this two part question given the information at the

(20 points) Assume that a cogeneration heating distribution system can be constructed for $14600 per unit of capacity and can be operated at variable costs of $0 (heat is supplied by an industrial facility that operates 24 hours every day). Assume that during 8 hours of the day the on peak demand for heat is P=a-bQ. Assume that during the other 16 hours of the day (off-peak) the demand for heat is one-half of the demand during the peak period. Assume that the cost of capital, r, is 10% and that heating distribution system does not depreciate. 1. Assume on-peak demand is P=160.08Q, and o-peak demand is P=160.16Q. If the existing capacity (Q) were 120 units, what would be the socially optimal prices during the onpeak hours and during the off-peak hours? 2. What would be the optimal capacity? What would be the prices at this optimal capacity

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!