Question: please, I need help Problem 4 (3 marks) A work centre operates 2 shifts per day, 5 days per week (8 hours per shift) and

please, I need help
Problem 4 (3 marks) A work centre operates 2 shifts per day, 5 days per week (8 hours per shift) and has 4 machines of equal capability. This is the effective capacity. If the work centre has a system efficiency of 95%, what is the expected output in hours per week? Problem 5 (10 marks) Janelle Heinke, the owner of Hot Pizza! is considering a new oven in which to bake the firm's signature dish, vegetarian pizza Oven type A can handle 20 pizzas per hour. The fixed costs associated with oven A are $20,000 and the variable costs are $2.00 per pizza. Oven B is larger and can handle 40 pizzas an hour. The fixed costs associated with oven B are $30,000 and the variable costs are $1.25 per pizza. The pizzas sell for $14 each. a) b) c) d) What is the break-even point for each oven? If the owner expects to sell 9,000 pizzas, which oven should she purchase? If the owner expects to sell 12,000 pizzas, which oven should she purchase? At what volume should Janelle switch ovens? (Hint: this occurs when the profits are the same for both ovens)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
