Question: please I only want question 1.7 Question 1 Mango Airways has twelve scheduled flight per day from Cape Town to Durban. As part of their

please I only want question 1.7
Question 1 Mango Airways has twelve scheduled flight per day from Cape Town to Durban. As part of their process improvement programme they have decided to conduct an investigation into the turnaround time at Cape Town airport. The turnaround time specified is +15 minutes. The data recorded below was obtained during a typical 15 day period. The turnaround time is assumed to be normally distributed Day X1 X3 X4 Xs 1 7 8 6 -2 0 2 8 7 S 2 -2 3 7 8 5 2 0 4 5 7 8 0 0 5 9 -3 6 4 0 6 9 -2 -1 5 8 7 2 7 4 5 0 8 8 10 12 15 13 9 9 12 IS 8 9 10 9 13 10 11 7 11 10 6 9 12 13 12 13 8 12 12 10 13 10 15 10 8 12 14 12 14 IS 10 11 15 12 15 16 17 20 1.1. Calculate the process mean and standard deviation 1.2. Determine the upper and lower control limits for x and R control charts. 1.3. Determine the upper and lower control limits for x and S control charts. 1.4. Set up * and R control charts on this process. Is this process in control? Explain. 1.5. Set up & and S control charts on this process. Is this process in control? Explain. 1.6. Calculate and interpret the process capability index for this process. 1.7. A penalty charge of R 15,000.00 is payable by the airline for late departures. Calculate the penalty that Mango will pay per annum in penalties. (8)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
