Question: Please include explanation of what the answer means . A concrete beam manufacturer produces two products. Type A requires 2 hrs of preparation, 4 hrs
Please include explanation of what the answer means .

A concrete beam manufacturer produces two products. Type A requires 2 hrs of preparation, 4 hrs of casting, and 10 hrs of finishing; while Type B requires 5, 1, and 5 hrs, respectively. There are time constraints in hours for the two products as shown: 2A +5B