Question: Please make sure to include the graph and the diagram along with the answer. You are the Owner's project manager on an electrical upgrade project.
Please make sure to include the graph and the diagram along with the answer.
You are the Owner's project manager on an electrical upgrade project. Existing overhead power lines are being buried in a duct bank to hide them from view in an area of the town that is being revitalized. There are a total of miles of power lines being buried. All the power lines being buried are on one street and run in a straight line. Due to the size of the wires, a pull box needs to be installed every feet.
There are three primary activities in burying the power lines:
Dig and install pull boxconduit
Pull wires
Terminateconnect wires
Labor:
A fourman crew can install one pull box and ft of conduit in days.
A sevenman wire crew can test and install ft of wire per day.
A threeman electrician crew can terminate connections per day.
Task
Draw an LOB diagram to illustrate how it works. Submission can be handwritten and uploaded or created on the computer.
Submit a written explanation of what the LOB is going to tellshow the contractor and why it would be useful in this application.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock