Question: Please need answer quick!!! Problem 1-10 marks Below is the network of activities (denoted as directed links/arrows) of the project of a new prototype. The

Please need answer quick!!!
Problem 1-10 marks Below is the network of activities (denoted as directed links/arrows) of the project of a new prototype. The direction of the activities from the start node s, to the end node e, signify the progress of the project towards completion. We are interested in finding the completion time of this project and we know from Critical Path Method (CPM), that it would be the same as the length of the longest path in the network. Given the activity durations (time in days) as shown above each of activity, a) Formulate the problem as a BIP model. (8 marks) b) Determine the optimal solution by visual inspection. (2 marks) 1 2 5 S e 3 3 5 bStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
