Question: please provide a detail answer with whatever is needed everything with excel formulas 2. The ABC company is very happy with your work and the
2. The ABC company is very happy with your work and the optimal shipping schedule for Problem 1 above. The company also determined the manufacturing cost, distribution center cost and selling price at the customer centers. These costs are listed in the following tables From Shipping Costs in Manufacturing $ amount Cost per box Gurley Bismarck $35 $40 $90 65 30 $70 50 25 $80 $12 $15 Nashville Tracy Richmond DC Cost per box From Gurly Bismarck Selling Price/box Shipping Costs in S amount To Harrisburg To Jacksonville To Dallas 35 25 46 45 30 40 $200 $220 $180 To Portland 60 45 $240 a Prepare a profit matrix, i.e., profit of each shipping path (30) b. The company wants you to find a shipping schedule to maximize total monthly profit. Define variables, write the objective function and constraints for maximizing monthly profit. (20) c Create an Excel worksheet with formulas and determine an optimal shipping schedule d Attach Initial and final worksheet and a copy of the Solver parameters. (40) e. Attach the shipping schedule either typed one or written with your hand
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
