Question: Please provide calculations for each number and include formulas for variances. Thanks. PROBLEM 11-18. (Appendix) Recording Standard Costs [LO 1, 2] Bechtel Technical Clothing produces

 Please provide calculations for each number and include formulas for variances.Thanks. PROBLEM 11-18. (Appendix) Recording Standard Costs [LO 1, 2] Bechtel Technical

Please provide calculations for each number and include formulas for variances. Thanks.

PROBLEM 11-18. (Appendix) Recording Standard Costs [LO 1, 2] Bechtel Technical Clothing produces parkas used by arctic explorers, mountain climbers, and people living in Minnesota. The company uses a standard costing system, and standards call for 2.5 yards of material at $55 per yard for each parka. The standard cost for labor is 3.5 hours at $35 per hour. Standard overhead is $14 per unit. For the year 2018, expected production is 8,000 parkas with fixed overhead of $60,000 and variable overhead of $6.50 per parka. During 2018, 8,500 parkas were manufactured. The company purchased 24,000 yards of material at a cost of $1,375,000. Production required 22,300 yards of material. The cost of direct labor was $1,000,000 for 27,500 hours. Actual overhead for the year was $90,000. REQUIRED a. Prepare a journal entry to record the purchase of material. b. Prepare a journal entry to record material used in production. c. Prepare a journal entry to record direct labor. d. Prepare a journal entry to record actual overhead and overhead applied. e. Prepare a journal entry to close the variances in requirements a through d to Cost of Goods Sold

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!