Question: please provide correct answer to the questions. 6. The 7 Wastes of Lean 1 point possible (graded) All of the options below could be implemented

please provide correct answer to the questions.
6. The 7 Wastes of Lean 1 point possible (graded) All of the options below could be implemented to reduce the waste of Motion EXCEPT Check: does the machine need to be monitored? Are there built-in checks to stop the machine from producing defective products? Check: do manual and machine work cycles contain unnecessary motion elements? Check: are the tooling, equipment and parts around work stations optimized? Check: is the layout optimized for varying customer demands
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
