Question: Please provide formulas. The three-station work cell at Pullman Mfg., Inc. is illustrated in the figure below. It has two machines at station 1 in

Please provide formulas.

Please provide formulas. The three-station work

The three-station work cell at Pullman Mfg., Inc. is illustrated in the figure below. It has two machines at station 1 in parallel (i.e., the product needs to go through only one of the two machines before proceeding to station 2).

Station 1Machine AStation 1Machine BStation 2Station 320 min/unit20 min/unit15 min/unit6 min/unit

A three-station work cell has a product that must go through one of the two machines at station 1 (they are parallel) before proceeding to station 2 and then on to station 3. Both Machine A and Machine B at Station 1 take 20 minutes per unit. Station 2 takes 15 minutes per unit. Station 3 takes 6 minutes per unit.

a) The throughput time is

enter your response here

minutes (enter your response as a whole number).

b) The bottleneck time of this work cell is

enter your response here

minutes per unit (enter your response as a whole number).

c)

Station 3

Station 2

Station 1

is the bottleneck station.

d) If the firm operates

8

hours per day, 6 days per week, the weekly capacity of this work cell is

enter your response here

units (enter your response as a whole number).

The three-station work cell at Pullman Mfg., Inc. is illustrated in the figure below. It has two machines at station 1 in parallel (i.e., the product needs to go through only one of the two machines before proceeding to station 2). 20 min/unit Station 1 Machine A Station 2 Station 3 15 min/unit 6 min/unit Station 1 Machine B 20 min/unit a) The throughput time is minutes (enter your response as a whole number). b) The bottleneck time of this work cell is minutes per unit (enter your response as a whole number). c) is the bottleneck station. units (enter d) If the firm operates 8 hours per day, 6 days per week, the weekly capacity of this work cell is your response as a whole number)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!