Please provide the role of a Project Engineer in this project Your company has pre-qualified to...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Please provide the role of a Project Engineer in this project Your company has pre-qualified to submit a bid package on Senior High School project under the traditional project delivery system (Design/Bid/Build). The project involves construction and start-up of high school building costing $100M. As a part of the bid package, you have been asked to prepare a document explaining your project management plan in detail. You don't have to go much into the Technical Specs of the project as you are not required to design anything. HD Senior High School will be a 230,130 gross square foot new high school facility to accommodate up to 900 students in grades 9 through 12. The facility is designed around a developing trend in high schools that are focused on Science, Technology, Engineering and Mathematics (STEM). This newly developed STEM Concept allows students to learn in a very practical and hands-on manner. The STEM requirements allow for integral design of classroom and laboratory spaces. An emphasis in technology at HD High School is also very present. Classrooms will use interactive smart board technology and students will all have individual laptops. The actual facility of HD Senior High School will be striving to achieve LEED Gold Certification upon completion under the LEED for Schools program by the US Green Building Council. Green Roof technology and highly reflective EPDM roofing membrane will assist in achieving critical LEED Points. An elaborate rain and grey water system will also be used to reduce run-off and conserve water. A Baysaver system will be used to filter all other run-off water. In addition to the high-tech classrooms, the facility construction also includes a competition gymnasium, auxiliary gymnasium, natatorium, auditorium, cafeteria, artificial turf football field, eight lane all-weather track, throwing areas, high jump and triple jump areas, softball field and press boxes. Project complexities/constraints: Suggest preferred method of construction for the structural system. With building height not being a design limitation, in respect to maximizing number of floors this can be factored into the method chosen. • Existing facilities on site have to be demolished. A 300 square foot hole ranging from 6 to 14 feet deep must be filled with structural fill after dewatering and stabilization. • The site allows limited on-site parking and street parking is available for overflow parking. • The surrounding area is mostly residential and street parking will provide some parking spaces during construction. Many construction recycling companies are available to the area, from Aggregate on site recycling to sorting and hauling services. The concrete from the existing facility will be recycled during demolition. • Subsurface and site conditions from the demolition pose a hazard to the surrounding area due to the groundwater level and large holes on the site. • Certain areas range from 6 to 14 feet below grade and contain up to 10 feet of water. • The soil bearing capacity does not require anything more than the use of geopeirs in certain locations. Spread footings are sufficient in certain areas and for detached structures around sports facilities. • Rain water harvesting and grey water capturing will be implemented for re-use in certain plumbing fixtures. • The building is also expected to achieve LEED Gold under USGBC LEED for Schools. Successful management: The successful management of the project depends on the ability to overcome the obstacles described above (and any additional constraints), control project costs, complete the construction within the timetable, deliver quality operable facilities, and maintain a positive relationship with neighborhood. Please provide the role of a Project Engineer in this project Your company has pre-qualified to submit a bid package on Senior High School project under the traditional project delivery system (Design/Bid/Build). The project involves construction and start-up of high school building costing $100M. As a part of the bid package, you have been asked to prepare a document explaining your project management plan in detail. You don't have to go much into the Technical Specs of the project as you are not required to design anything. HD Senior High School will be a 230,130 gross square foot new high school facility to accommodate up to 900 students in grades 9 through 12. The facility is designed around a developing trend in high schools that are focused on Science, Technology, Engineering and Mathematics (STEM). This newly developed STEM Concept allows students to learn in a very practical and hands-on manner. The STEM requirements allow for integral design of classroom and laboratory spaces. An emphasis in technology at HD High School is also very present. Classrooms will use interactive smart board technology and students will all have individual laptops. The actual facility of HD Senior High School will be striving to achieve LEED Gold Certification upon completion under the LEED for Schools program by the US Green Building Council. Green Roof technology and highly reflective EPDM roofing membrane will assist in achieving critical LEED Points. An elaborate rain and grey water system will also be used to reduce run-off and conserve water. A Baysaver system will be used to filter all other run-off water. In addition to the high-tech classrooms, the facility construction also includes a competition gymnasium, auxiliary gymnasium, natatorium, auditorium, cafeteria, artificial turf football field, eight lane all-weather track, throwing areas, high jump and triple jump areas, softball field and press boxes. Project complexities/constraints: Suggest preferred method of construction for the structural system. With building height not being a design limitation, in respect to maximizing number of floors this can be factored into the method chosen. • Existing facilities on site have to be demolished. A 300 square foot hole ranging from 6 to 14 feet deep must be filled with structural fill after dewatering and stabilization. • The site allows limited on-site parking and street parking is available for overflow parking. • The surrounding area is mostly residential and street parking will provide some parking spaces during construction. Many construction recycling companies are available to the area, from Aggregate on site recycling to sorting and hauling services. The concrete from the existing facility will be recycled during demolition. • Subsurface and site conditions from the demolition pose a hazard to the surrounding area due to the groundwater level and large holes on the site. • Certain areas range from 6 to 14 feet below grade and contain up to 10 feet of water. • The soil bearing capacity does not require anything more than the use of geopeirs in certain locations. Spread footings are sufficient in certain areas and for detached structures around sports facilities. • Rain water harvesting and grey water capturing will be implemented for re-use in certain plumbing fixtures. • The building is also expected to achieve LEED Gold under USGBC LEED for Schools. Successful management: The successful management of the project depends on the ability to overcome the obstacles described above (and any additional constraints), control project costs, complete the construction within the timetable, deliver quality operable facilities, and maintain a positive relationship with neighborhood.
Expert Answer:
Answer rating: 100% (QA)
Field and project engineers plan design develop and manage projects for the construction or repair o... View the full answer
Related Book For
International Human Resource Management
ISBN: 978-1408032091
6th edition
Authors: Peter Dowling, Marion Festing, Allen Engle
Posted Date:
Students also viewed these general management questions
-
You have been asked to prepare a report showing monthly sales by geographic region. Most of the managers using the report are not accountants, so your supervisor thought they would be more likely to...
-
You have been asked to prepare a brief statement about labor force participation rate for males and females (percentage of population age 15-64). Using statistics from the following table obtained...
-
As a new project manager, you have been asked to consider using the AS4071 structure for your software development project plan. What aspects of this template would you change? Why?
-
Implement the method contains() for BST.
-
Use the data in INVEN.RAW for this exercise; see also Computer Exercise CI 1.6. (i) Obtain the OLS residuals from the accelerator model (inventt - (0 + (1(GDPi + ut and use the regression t on t-1 to...
-
Are there any disadvantages to zero inventory? Explain.
-
Blair Company has $\$ 5$ million in total assets. The company's assets are financed with $\$ 1$ million of debt and $\$ 4$ million of common equity. The company's income statement is summarized...
-
Suppose the S&P 500 index is 1100 and that it is possible to lend at 4 % and borrow at 7 %. The index pays continuously compounded dividend yield of 2%. a) Suppose you observe a 6-month price of...
-
A vector has an x-component of -24.0 m and a y-component of -36.8 m. Find the vector's angle in , as a value between 0 and 360. Remember that angles are measured from the positive x-axis, where a...
-
On January 31, 2018, The Hershey Company acquired Amplify Snack Brands, Inc., its largest business acquisition to date. Access Hersheys 2018 financial statements and media reports near the time of...
-
1: Use the YIELD function in Excel to find the yield tomaturity of a bond with the following characteristics. The yield tomaturity on this bond is over 7%. Settlement 5/17/2018 Maturity 5/17/2028...
-
Students are to select Sweden and use publicly available sources to discuss how this country's economy is performing. Use current and relevant data (at least 5 reputable sources). Use coverage of...
-
Create an executive summary that analyzes the impact that adoption of International Financial Reporting Standards would have on Swift's financial statements and its investors. For your analysis,...
-
Anna received 100 shares of Foxtrot stock as a gift from her father on November 15, Year 2, when the fair market value (FMV) of the stock was $20 per share. Her father had purchased the stock on...
-
Scott's Car Storage rents storage space for customers' cars during the winter months. The service costs $600 per car for the six-month period of October through March, with payment due up-front....
-
The Sales Growth Index (SGI) is calculated as follows: a. prior year sales divided by current year sales b. current year sales divided by prior year sales c. change in receivables divided by current...
-
Given the data below answer the questions.
-
Use a calculator to evaluate the expression. Round your result to the nearest thousandth. V (32 + #)
-
What evidence is there to show that corporate codes of conduct are effective?
-
Describe the development phases of an M&A and the respective HR implications.
-
Should multinationals be concerned about expatriate failure? If so, why?
-
With reference to Exercise 4.5, find an expression for the distribution function \(F(x)\) of the random variable. Data From Exercise 4.5 k 4.5 Given that f(x): = is a probability distribution for 2x...
-
Given that \(f(x)=\frac{k}{2^{x}}\) is a probability distribution for a random variable that can take on the values \(x=\) \(0,1,2,3\), and 4 , find \(k\).
-
Check whether the following can define probability distributions and explain your answers. (a) \(f(x)=\frac{1}{4}\) for \(x=10,11,12,13\) (b) \(f(x)=\frac{2 x}{5}\) for \(x=0,1,2,3,4,5\) (c)...
Study smarter with the SolutionInn App