Question: Please see attached screen shot for data. Question #2. A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have

Please see attached screen shot for data.
Question #2. A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $14 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $350 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost?
The optimal integer solution is to build _______ flat(s) and rent _______ flat(s); build _____ hanging drop(s) and rent ______ hanging drop(s); build ______ props and rent _______ prop(s). This solution gives the (minimum or maximum) cost, which is $______.
A B B 1 Carpentry 0.5 3 Painting 2 12 3 1 2 Flats 3 Hanging Drops 4. Props 5 6 WN NStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
