Question: please show all calculations and formulas Computer and Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the

please show all calculations and formulas
please show all calculations and formulas Computer and Time Jackson Fabricators Inc.
machines metal parts for the automotive industry. Under the traditional manufacturing approach,

Computer and Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: using and finishing Parts are produced in batch sizes of 50 parts. A part requires 5 minutes in milling and 9 minutes in finishing. The move time between the two operations for a complete batch is 10 minutes Under the loan philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size reduced to 4 parts and the move time is eliminated Determine the added, non value added, and total load times, and the value added radio under the traditional and lean manufacturing methods. If required, round percentagestone decimal place Traditional Philosophy Lean Manufacturing Philosophy Value-added time 14 min 14 min Non-value-added time 696 min 126 min Total time 710 min 140 min Value-added ratio (as a percent) 2.0 10 Computed Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing Parts are produced in batch stres of 50 parts. A part requires 5 minutes in milling and 9 minutes in finishing. The move time between the two operations for a complete batch is 10 minutes Under the loan philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch stre is reduced to parts and the move time is eliminated Determine the awes, main-ve-added, and total lead times, and the value-added ratle under the traditional and lean manufacturing methods. If required, round percentages to one decimal place Traditional Philosophy Lean Manufacturing Philosophy 14 min Value-added time 14 min Non value-added time 696 min 126 min Total lead time 710 min 140 min Value-added rabo (percent) 2.0 10

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!